Buyer answer · Water-soluble PVA materials
What belongs in a factory audit checklist for a Chinese water-soluble yarn mill?
Direct answer
Audit legal identity, manufacturing flow, material control, equipment, testing, traceability, change control, packaging, worker and environmental practices, and export-document capability. Follow one sample or batch from input to release.
Manufacturing and quality
Map every in-house and outsourced step, critical parameter and inspection point.
Traceability and change
Check how raw materials, recipes, batches, rework and specification changes are recorded.
Commercial execution
Review capacity, lead-time planning, packing, complaint handling and continuity controls.
Information to include in your inquiry
- Process flow and site tour
- Equipment and calibration list
- Batch record and test demonstration
- Corrective-action example